The time it takes for a pool with a heater to warm up after first filling it depends on factors such as the size of the pool, the starting temperature of the water, the power of the heater, and the ambient temperature. In general, it can take anywhere from 24 to 72 hours for a pool with a heater to reach the desired temperature.
3kw heater heating a 10 foot pool may take 4 to 8 hours for heating it up to 20 to 25 Degrees Celsius. This also depends on the outside temperature.
The system will take 30 ounces of R134a freon.............
1.88 pounds of 134
1.6
It depends on the year and witch type of freon you have but on a 2003 model it will take 1.6 pounds of R134a freon................
How much freon does it take for a 2000 Chevy full size truck
i have a 5ft pool and have a intex 3kw heater how long will it take to heat pool to a good swimm tempature
It does not take Freon. It uses R134a refrigerant.
take it to someone that can reclaim it
0.9lb
1lb 6oz