answersLogoWhite

0


Best Answer

If you are talking about plaster and are plastering the spa only then ususally the cost is a flat cost to have done estimated $1000-1400

User Avatar

Wiki User

13y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How much does cement cost for lining the sides of a built in to the ground hot tub?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

How is cement formed?

Cement is formed by heating limestone, clay, sand, and iron ore in a kiln at very high temperatures to create a material called clinker. The clinker is then ground into a fine powder and mixed with gypsum to form cement. This cement powder is mixed with water to create a paste that binds materials together in construction.


What is the best way to install an above ground pool ON cement?

You are going to have to tear some of it up to put the pool in. the rest would depend on the strength of the concrete you have on the ground. If it is reasonably strong you could cover it with something like 20mm ply to protect it from the machinery operating on it during the building and hope for the best.


The built adobe style homes into the sides of cliffs?

The Anasazi


What is canal lining?

an impervious layer is provided at the bed and sides of canal to improve the life and discharge capacity of canal known as canal lining.The canal lining is something that provides a barrier to the surface of a canal on the bed and sides that improves the canal. It is a man made layer that helps make the canal last longer and improves the waterflow.


How do you flat line a dress?

Flat-lining is sewing your the lining and shell pieces of your project (wrong sides together) before you assemble. You then treat the flat lined piece as one; flat lining allows for a heavier weight to the material which can aid construction. Your question doesn't state whether this is part of the pattern instructions, but I am assuming it calls for flat-lining prior to assembling any of the pieces.


What is an embankment built along sides of a river to control flooding?

a leeve


Have lime build up on sides of pool above ground?

YES


Why is the liberty stadium in swansea?

It was decided to that Swansea FC needed a ground that was up to the national FA requirements. The Regional Rugby team - The Osprays also needed facilities as they were using the St Helens Ground in Swansea. The Liberty was built to facilitate the two sides and provide a larger stadium just off the M4 Motor Way


Where do swimming pool water bugs come from?

Probabily the ground surrounding your pool if its in-ground. In an above-ground pool they most likely fly into the pool or crawl into it from the sides.


Why did they built the Grand Canyon?

Nobody built the Grand Canyon--it formed naturally because the Colorado River eroded the sides of the canyon off.


How do you repair in-ground pool liner loose from sides?

I suggest searching for the answer on eHow.com.


Why are pyramid sides built at a slant?

Because that makes it a pyramid. It it did not slant it would be a cube