In June 2015, after careful review, the price to construct a new building in Jamaica varies from JAD$ 15,544.00 to JAD$ 58,000.00 (approx.US$ 134.00 to $500.00 per sq ft) and can exceed JAD$ 62,150.00 (approx. US$ 550.00 per sq. ft.)
To build a timber structure (using Raft Foundation) in Jamaica varies from JAD$ 15,544.00 to JAD$ 23,432.00 (approx. US$ 134.00 to US$ 202.00) and up.
To build a timber structure (using Strip and Pad Foundation) in Jamaica varies from JAD$ 19,836.00 to JAD$ 28,188.00(approx. US$ 171.00 to US$ 243.00) and up.
To build a concrete structure using Strip and Pad foundation in Jamaica varies from: JAD$ 34,684.00 to JAD$ 58,000.00 per sq.ft. (approx. US$299.00 to US$ 500.00 per sq.ft.) or can exceed JAD$ 63,800.00 (approx. US$ 550.00).
However, to build a concrete structure using Raft Foundation in Jamaica varies from: JAD$ 20,996.00 to JAD$ 40,368.00 per sq.ft. (approx. US$181.00 to US$ 348.00 per sq.ft.) or can exceed JAD$ 46,400.00 (approx. US$ 400.00).
When building, the price to build are dependent on these factors:
(i) The size of the building
(ii) The shape and complexity of the building and it's design
(iii) The buildings structural purpose and nature.
(iv) The type of building materials to be used in and outside the building
(v) The shape, complexity, and the topography of the land
(vi) The structural nature and capacity (strength) of the soil
(vii) The ease of accessibility to and from the building site
(viii) The Labor and Administrative Costs
(xi) Taxes to be paid (N.H.T.; N.I.S.; P.A.Y.E.; STAMP DUTY TAX; and LEVY TAX)
The RED ZONE (the DANGER ZONE) for both clients and builders desiring to build would be below:
(i) JAD$ 15,544.00 (US$134.00) for timber (using Raft Foundation);
(ii) JAD$ 19,836.00 (US$171.00) for timber (using Strip & Pad Foundation);
(iii) JAD$ 20,996.00 (US$ 181.00) for concrete (using Raft Foundation).
(iv) and JAD$ 34,684.00 (US$ 299.00) for concrete ( using Strip & Pad Foundation);
\it is the squaRe if your mo
What is the House building cost per square foot northwest and is this just for the building work only or does this include the interior
$45000
$200 per square foot
The construction cost per square foot in Asheville, North Carolina is about $88 per square foot. This means a 3000 square foot building would cost about $264,000 to build.
The average cost per square foot for building a house in Ohio can range from $90 to $140. This means a 500 square foot house could cost between $45,000 and $70,000 to build.
I heard it was about $1000.00 per square foot.
The commercial construction cost per square foot in Arizona will average at about $101 per square foot. This means a 3,000 square foot building should cost about $300,000 to build.
The average cost for building a house is Delaware is $101. 69 per square foot. The average cost to build a home in California is $128. 93 per square foot.
The cost of a building is calculated by the number of corners that are inside the building. You can also calculate the cost by using the square-foot size.
What is the typical per square foot cost to build in New Hampshire (not including land)?
The average construction cost per square foot in central Virginia is about $125. This means a 200 square foot building would cost about $25,000 to build.