Akosombo Dam was created in 1965.
Akosombo dam.
Ghana.
maybe
£130 million
The Akosombo dam was started in 1961 and finished in 1965 taking four years in total, it cost £130 million pounds to make (most of which was borrowed).
examples are cars
The akosombo dam has many advantages such as the fact that the people who live in Ghana have learnt many life skills from the dam such as fishing, carpenting and canoe building. Also the akosombo dam has brought a health service in for the workers and free transport to and from work. On the economic sie of things the akosombo dam has brought in a transport route. There is now 2500 new jobs for the locals and also due to where the dam is situated is has allowed there to be a port for tomatoes and other procude to be available. There is a lot of more fertile soil for the agricultural side of Ghana and a wider diversity of plants!
The Akosombo dam produces H.E.P (Hydro Electric Power). It does so by the water coming from the reservoir (Lake Volta) goes into the dam which spins a turbine as it goes through, this then spins a generator. The generator has a stator and a rotor. The turbine spins the rotor which is a magnet and around the edge is the stator. The stator contains a metal (usually copper) which spins 1000's of times a minute creating Hydro Electricity.
it is used to power homes school and factories
Aswan high dam Akasombo dam Inga dam Hendrink dam Kariba dam Cabara dam Kiira dam Kainji dam
They were hoping to achieve, to decrease they water level of the Volta river