how long does it take to build a beam bridge of 2400 sq ft
it took 3 months to build the iron bridge in Newport Pagnell
About 4 years.
About 4 years.
5 years
200 years
8 years
They began to build it in 1925 and it opened in 1928.
The current bridge was built between 1968 and 1973.
1886 to 1894
1886 to 1894
10 years