The value of compaction for an asphalt base course is typically targeted at 95-98% compaction density. This level of compaction ensures that the base course is strong, durable, and able to support the weight of the overlaying asphalt layers and traffic loads. Achieving the specified compaction value is critical for the long-term performance of the pavement structure.

User Avatar

AnswerBot

βˆ™ 5mo ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How much is the value of compaction of asphalt base course?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Natural Sciences

List five layers of construction in footways and carriageways?

Subgrade: The natural soil or rock layer at the bottom. Subbase: Layer of aggregate material placed on top of the subgrade. Base course: Layer of cement-treated or asphalt-treated aggregate material. Binder course: Layer of asphalt concrete or cement concrete providing strength and stability. Surface course: The top layer of asphalt or concrete providing smoothness and skid resistance.


What is ABC gravel?

ABC gravel stands for Aggregate Base Course gravel, which is a mixture of finely crushed aggregate and sand used as a base for paving and construction projects. It is commonly compacted and graded before the application of asphalt or concrete surfaces.


Can you use ballast as a sub base?

Ballast is typically a layer of coarse stones used to provide support and stability for railroad tracks or as a base for roads. It is not commonly used as a sub base for construction projects as it lacks the necessary strength and compaction characteristics required for a stable foundation. It's best to use materials specifically designed for sub base applications, such as crushed stone or gravel.


What is a base that has a value above seven?

One example of a base with a value above seven is the base-16 system, also known as hexadecimal. In hexadecimal, the base is 16 and uses the digits 0-9 and the letters A-F to represent values.


What causes cracks inasphalt pavement?

Cracks in asphalt pavement can be caused by factors such as water infiltration, heavy traffic loads, freezing and thawing cycles, poor installation, or underlying base issues. These factors can lead to deterioration and weakening of the pavement, resulting in cracks forming over time. Regular maintenance and repairs can help prevent or mitigate the development of cracks in asphalt pavement.

Related questions

What is the required compaction for base course under concrete roads?

Depending on the specification requirement of the project, but usually it requires at least 100% compaction.


What is asphalt concrete type 1 surface course and asphalt concrete type 2 intermediate course and asphalt concrete base and tack coating between courses?

can we use polypropline fibre in concrete


How long should the base set before asphalt paving?

It can sit for as little time as it takes to move the paving equipment into place. What you are looking for is the compaction of the base. As long as it meets the standards given by the architect and engineer, you will be fine.


What is the major importance of prime coat on base course?

The major importance of prime coat on base course should be to produce an appropriate surface for a stronger bond between the asphalt binder course and the base course. Apart from this, the prime coat also discourages the intrusion of surface moisture into the underlying layers.


What is the minimum and maximum time required between prime coat and asphalt base course?

Generally it will be as project specification or as directed by the Engineer.


What is the problem if use the wearing course in the place of binder course?

Asphalt binder course is an intermediate course between a base course and an asphalt surface course. The binder course is usually a coarse-graded aggregate Asphalt Concrete containing little or no mineral matter passing through a No. 200 sieve. The surface course is one or more layers of a pavement structure designed to accommodate the traffic load, the top layer of which resists skidding, traffic abrasion, and the disintegrating effects of climate. The top layer is sometimes called the wearing course. This course is very fine in gradient compared to binder.


What has the author N W Lister written?

N. W. Lister has written: 'Deflection criteria for flexible pavements and the design of overlay' 'The compaction of bituminous base and base-course materials and its relation to pavement performance'


List five layers of construction in footways and carriageways?

Subgrade: The natural soil or rock layer at the bottom. Subbase: Layer of aggregate material placed on top of the subgrade. Base course: Layer of cement-treated or asphalt-treated aggregate material. Binder course: Layer of asphalt concrete or cement concrete providing strength and stability. Surface course: The top layer of asphalt or concrete providing smoothness and skid resistance.


What is MC-1 primer for asphalt?

MC-1 primer for asphalt is a common solvent used for roadways and pavements. It is commonly used as a base application.


What is the unit weight of base asphalt?

normal 20 kN/m^3


What is ABC gravel?

ABC gravel stands for Aggregate Base Course gravel, which is a mixture of finely crushed aggregate and sand used as a base for paving and construction projects. It is commonly compacted and graded before the application of asphalt or concrete surfaces.


What has the author Charles F Potts written?

Charles F. Potts has written: 'Sulphur extended asphalt base evaluation, Alachua County, Gainesville, Florida' -- subject(s): Asphalt Pavements, Design and construction, Pavements, Asphalt, Subgrades, Sulphur in building, Testing