answersLogoWhite

0


Best Answer

0-30 days

User Avatar

Abbie Hyatt

Lvl 13
2y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: An acceptable time period for the activation and relocation phase of the continuity cycle?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Natural Sciences

Does activation energy depend on collision frequency?

No, activation energy is a fixed value for a specific reaction and does not depend on collision frequency. Activation energy is the minimum amount of energy required for a reaction to occur, while collision frequency relates to the number of collisions that occur in a given time period.


What is time-phased activation appropriate for?

Time-phased activation is appropriate for projects that have specific milestones or deadlines that need to be met at different points throughout the project timeline. It helps to ensure that resources are allocated and activated in a timely manner to meet these deadlines and milestones. This approach allows for better planning, monitoring, and control of project activities.


What is slow chemical reaction?

A slow chemical reaction is a process in which reactant molecules gradually convert into product molecules over an extended period of time. This type of reaction typically occurs at a slower rate due to factors such as low temperature, high activation energy, or a complex reaction mechanism. Examples include rusting of iron or the breakdown of organic matter in compost piles.


What ion is rapidly moving into the cell during the depolarization period of an action potential?

Sodium.A positive ion (cation) that enters the cell (influx) rapidly when the membrane threshold is reached and the voltage gated sodium channels open.This occurs during the rising phase of an action potential, i.e. membrane depolarization beyond the threshold for activation.


An EOC that can remain operable for an extended period of time regardless of the type of incident or other damage to the infrastructure is considered to be?

Considered to be a resilient EOC. Resilient EOCs are designed to maintain functionality and communications capabilities in the face of various disruptions, ensuring continuity of operations during emergencies. This ensures that critical decision-making processes can continue even under adverse conditions.

Related questions

An acceptable time period for the activation and relocation of the continuity cycle is?

0-30 days


An acceptable time period for the activation and relocation phase of the continuity cycle is?

The activation and relocation phase of a continuity cycle typically lasts between 24 to 72 hours. This timeframe allows for the necessary preparations and execution of processes to ensure a smooth transition to the backup site.


What is an acceptable time period for the activation and relocation phrase od the continuity cycle is?

0-12 hours


Why is the medieval period called the period of continuity and change?

because the medial period covered from 700 ad to 1800 BC


The abbreviation Blvd takes a period or not?

It can take or not take. Both are acceptable.


A type 4 incident that is concluded within one operational period will usaully not need the activation of the?

finance


Is is best to remove an IUD before or after your period?

Both times are equally acceptable.


What does Continuity Mean?

The unbroken and consistent existence or operation of something over a period of time.A state of stability and the absence of disruption


Does activation energy depend on collision frequency?

No, activation energy is a fixed value for a specific reaction and does not depend on collision frequency. Activation energy is the minimum amount of energy required for a reaction to occur, while collision frequency relates to the number of collisions that occur in a given time period.


A type 4 incident is concluded within on operational period will usually NOT need the activation of the?

finance/administration section


How do you undo member ships?

it can't be undo once the membership card is activated its will be deactivated when the period of activation is over.


Is avs video editor free?

NO, All AVS software products are shareware and do require activation beyond the trial period.