answersLogoWhite

0

A colon is used prior to describing a sequence.

Example:
She makes a peanut butter and jelly sandwich: first, spreading peanut butter on a slice of bread; second, spreading the jelly on the other slice of bread; and third, smashing the two together.

User Avatar

Wiki User

15y ago

Still curious? Ask our experts.

Chat with our AI personalities

EzraEzra
Faith is not about having all the answers, but learning to ask the right questions.
Chat with Ezra
SteveSteve
Knowledge is a journey, you know? We'll get there.
Chat with Steve
CoachCoach
Success isn't just about winning—it's about vision, patience, and playing the long game.
Chat with Coach

Add your answer:

Earn +20 pts
Q: What punctuation is needed prior to describing a sequence?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Math & Arithmetic

What are the prior skills needed for combining like terms?

Basic knowledge of addition and subtraction.


How was the coordinate plane discovered?

A general coordinate system had to be devised prior to describing planes or other objects. As provided in the link, Rene Descartes is considered the founder of the Cartesian coordinate system in 1637, but Fermat also made contributions. See related links on the lives of Descartes and Fermat.


Give the simple formula for the nth term of the following arithmetic sequence What if your answer will be of the form an plus b?

If the formula for additional terms was the summation of the term before it, the nth term of the series would be the sum of all terms prior. In other words it would be the summation of a through n minus 1.


Posterior and prior probability what do they mean?

prioirandposterior dist


Do prior department costs behave similarly to direct materials cost?

Prior department costs behave the same as direct materials, which are typically added at the start of production. They are treated separately because they represent the accumulation of costs from previous departments rather than the receipt of materials from the stores area. It is helpful to separate prior department costs from other costs because the manager of the department receiving the transferred units has no control over the costs incurred in prior departments. Thus, the prior department costs are not useful for evaluating the performance of the manager of the department receiving the units.