Because he wanted to keep his citizens
Khrushchev didn't directly order the construction of the Wall. He told Walter Ulbricht, who was then General Secretary of the East German communist party, "you solve the problem of all your doctors defecting to the West or I will."
By Nikita Khrushchev's order.
Nikita Khrushchev was the third leader. The order went Lenin, Stalin, Malenkov, Khrushchev, Brezhnev, Andropov, Tikhonov, Chernenko, Gorbachev.
He found out when Kennedy demanded that Russian Premier Nikita S. Khrushchev remove all the missile bases and their deadly contents and also Kennedy ordered a naval quarantine of Cuba in order to prevent Russian ships from bringing additional missiles and construction materials to the island.
Vladimir Lenin, Joseph Stalin, Georgy Malenkov, Nikita Khrushchev, Leonid Brezhnev, Yuri Andropov, Konstantin Chernenko, Mikhail Gorbachev. In that order from the communist revolution in 1917 till 1991 when the USSR was disbanded. Lenin was the leader of the communist revolution. Stalin was the leader during World War Two. Nikita Khrushchev together with John F. Kennedy solved the Cuban Missil Crises preventing Nuclear War between the United States and The Soviet Union.
According to Nikita Khrushchev, Stalin and Eisenhower made a deal. Stalin claimed that he and the late US President Franklin D. Roosevelt had an agreement that Soviet troops should capture Berlin. Khrushchev pointed out that the Americans could have reached Berlin first. The Germans had concentrated the better part of their troops against the Soviet advance in order to surrender the capital to the Americans and the British. Stalin cited a letter he received from Roosevelt that because the Russians had lost so many lives to the Nazi's that they should be the ones to capture Berlin.
The emperor Vespasian ordered the construction of the Colosseum. The construction began in 72 AD.
Construction loans are loans that people take out in order to do construction. It can be the construction of a home start to finish, remodeling, or putting on an addition.
In project management, a change order is a component of the change weather conditions cause delays or require additional work to complete construction.
In a construction sales job, you are responsible for selling construction related materials and services. In order to be able to do your job, you need to have an education background in construction yourself.
L&T Construction, DLF, RPL Construction, BL Kashyap, Prestige, Unitech, Essar Construction, Kirloskar Group, Raheja. Listed in order of value of projects.