answersLogoWhite

0


Best Answer

A bill of materials is a list of materials and components used in a manufactured item, which are sometimes appended to an engineering diagram of the item.

User Avatar

Wiki User

8y ago
This answer is:
User Avatar
More answers
User Avatar

Wiki User

8y ago

A bill of material is another name for a bill of materials, a list of materials and components used in a manufactured item, which are sometimes appended to an engineering diagram of the item.

This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What is bill of materials?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is The service analogy to the bill of materials?

The service analogy to the bill of materials in a manufacturing company is the bill of resources ( BOR), which is a record of a service firm's parent- component relationships and all of the materials, equipment time, staff, and other resources associated with them, including usage quantities.


Who is responsible to firm a bill of materials?

Material Acquisition


What is usually included with a bill of materials?

A bill of materials is a list and the quantities of materials or components that make up a completed product. In many ways the BOM is a configuration log, without containing physical measures or dimensions of a product.


What are the difference between bill of quantity and bill of materials?

Bill of materials (BOM) is a list of the raw materials, sub-assemblies, intermediate assemblies, sub-components, components, parts and the quantities of each needed to manufacture a final product.Bill of quantities (BOQ) is a document used in tendering in the construction industry in which materials, parts, and labor and their costs are itemized.


Where would you find the drawing scale on a blueprint?

on the bill of materials


What is the name of stock materials added to fermenter?

Grain bill


Of what materials are the US bill made?

starch free paper.


What is a bill of quantities?

A bill of quantities is a list prepared by a quantity surveyor, of the quantities of materials needed for a specific project.


What source document is used to determine the actual amount of direct materials to record on a job cost sheet a. bill of materials b. production order c.materials purchase order d. materials requisit?

Materials requisition form


What is export sales?

export sales means to sale the materials from one country to another country in between seller and buyers to dealing with the materials and send by the materials in air,or shifment and the get the bill of lading.


What is the difference between Material take off and Bill of materials in piping?

A Material Takeoff is the process of analyzing(this includes list of materials with quantities and types,grades of materials and the weights of such materials) drawings and determining all the materials required to complete the design. A Bill of Materials is adocument that shows detailed desgriptions of materials used in completing a project,this includes,types of materials,specification of each item,gost of each item used,number and cost of labour used in completing the poject. The major difference between the two is:MTO is needed to make a BOM,a BOM aids in the procurement and requisition of materials.


What is provided with materials to confirm the number and type of item delivered?

A bill of lading is provided with materials to confirm the number and type of items delivered. The bill of lading lists the order number and what is in the order. It also lists the weight of the product which is very important in the trucking industry.