Best Answer

The tunnel was built under two contracts. One contractor used conventional drill and blast to excavate the entire 40 ft. high by 20 ft. wide tunnel profile, working from the west portal. The east portal contractor excavated a +or- 20 ft. diameter top heading with a tunnel boring machine and then used drill and blast to remove the remaining "bench". The tunnel was lined with concrete after excavation was complete. A third contractor built the ventilation shaft. The tunnel uses a unique ventilation system that consists of the shaft, a tail tunnel connecting the shaft to the main tunnel and doors at either end of the tunnel and near the vent shaft tail tunnel. The doors open and close so as to push exhaust out the vent shaft or pull fresh air from the vent shaft into the tunnel, depending on the position of the train in the tunnel. The tunnel was built to reduce the grade for westbound coal trains. This reduced the need for up to nine additional locomotives to push the coal trains up the steeper grade of the Connaught Tunnel.

User Avatar

Wiki User

16y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How was the mount MacDonald tunnel built?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

When was Mount Victoria Tunnel created?

Mount Victoria Tunnel was created in 1931.


When was Mount Baker Tunnel created?

Mount Baker Tunnel was created in 1940.


When was Mount Bolu Tunnel created?

Mount Bolu Tunnel was created in 2007.


When was Mount Royal Tunnel created?

Mount Royal Tunnel was created in 1918.


Whats the Longest tunnel in Canada?

The longest railway tunel in Canada is at Mount MacDonald, 14 723 m under Roger's Pass, Glacier National Park, CP


When was the thames tunnel built?

The Thames Tunnel was built between 1825 and 1843.


Why is the kaimai tunnel built?

its built for trains


Is there a tunnel from Miami to Puerto Rico being built?

No. No tunnel is being built from Miami to Puerto Rico.


What is the name of he railway tunnel built by Isimbard KingdomBrunel?

Box Tunnel


When was shindagha tunnel built?

Al Shindagha Tunnel was created in 1975.


When was the Hoosac Tunnel built?

Work on the Hoosac Tunnel began in 1848 and was completed in 1875.


Who was Mount Everest built for?

Mount Everest was not built; it formed by natural processes.