Before taking the test running, check that the positive and negative directions of the motors are line with the demands, especially the two motors of the overhead crane traveling mechanism must rotate at the same direction.
Begin the test running while the overhead crane is under the safety and normal condition. At the same time, the control handle is at null position. Turn on the knife-type switch and push the starting button of SB1. Connect the circuit and make the overhead crane in the condition ready for running.
There are 3 steps for the test running:
1. No-load test:
The procedures and requirements are the following:
1)Make the hoist traveling with no load along the rail 3 times to check no track-slipping of the wheels obviously. The starting and braking conditions are normal; the limit switches act correctly; the buffer in the hoist can collide with the bumper in the bridge structure accurately.
2)Hoist with no load test: make the hoist with hook up and down 3 times to make sure that the limit switches of the lifting mechanism act correct and reliable.
3)Travel the hoist to the middle point of the span, then travel the crane moving along the rail twice at the lower speed to check the supporting legs and rails. Make the overhead crane traveling at the rated speed roundly 3 times to check the working conditions of the traveling mechanism of overhead crane, no track-slipping of the wheels while starting and braking, travel smoothly, limit switch acting correctly and buffering reliable.
2. Static Load Test Running:
The procedures and requirements are the following:
1)Travel the hoist to the end limit position of the main girder. Mark the center point of the main girder while the overhead crane is stable.
2)Travel the hoist to the center part of the main girder to lift the materials at the lowest speed until the rated lifting capacity gradually. Now make the material off 100mm from the ground and suspend 10 minutes. Then measure the down deflection of the center part of the main girder and ensure that it will not exceed 1/750 of the span if the overhead crane working class is A5. Do the same test 3 times and guarantee that there is no residual deformation after unloading at the third test. The interval of each test is not less than 10 minutes.
3)After the overhead crane meet the above-mentioned tests, do the test with 1.25 times than the rated lifting capacity. To reduce the influence because of the deformation, travel the overhead crane around the column while doing the static test.
3. Dynamic Load Test Running:
The procedures and requirements are the following:
1)Make the hoist with the rated lifting capacity loading up and loading down repeat and travel the hoist with the rated lifting capacity 3-5 times back and forth along its rail. Finally move the hoist to the center part of the main girder and make the crane travel 2-3 times back and forth at the rated speed along its rail, meanwhile do the repeat starting and braking function. In the whole process, all the brakes, limit switches and electrical control components should be reliable, correctly and flexible. No track-slipping for the wheels, normal vibration of the bridge structure, steady traveling and lifting mechanism, and no residual deformation after unloading.
2)After the crane meet the above-mentioned tests, do the test with 1.1 times than the rated lifting capacity.
Powered by: Zhengzhou Huahzhong Construction Machinery Co. Ltd. (Short for ZZHZ)
Address: No.114 Industrial Road, Shangjie District, Zhengzhou City, Henan Province, China
Tel: +86-371-68000000
Mobile/Whatsapp: +86-13676949605
Gardner Crane's birth name is Edward Gardner Crane.
Robert Scott Crane's birth name is Robert Scott Crane.
Wattled Crane was created in 1789.
Demoiselle Crane was created in 1758.
Nicky Crane died in 1993.
Hydraulic Overhead Travelling Crane
Attaching a hoist trolly to an overhead crane is very difficult. The only way it can be attached is if you remove the crane head and then weld on the hoist trolley.
EOT Crane means Electric overhead traveling crane. I work for IMT the crane manufacturers.
HOT crane is term used for "Hand Operated Crane"
It was an overhead crane manufacturer
The overhead traveling bridge crane existed as early as 1860
Hydraulic overhead travelling cranes.
Electric Overhead Travelling (EOT) Electrical Overhead Travelling (EOT) cranes are simplest type of cranes used in industries for maintenance purpose(mostly). The capacity can go up to 50tons. The Indian standard for the EOT crane is IS3177. Some of the EOT crane manufacturers in India are LOADMATE, EDDY cranes, Armsel MHE pvt ltd.......
You can rent an overhead crane on any rental site online. However, to narrow down your search there are specific ones such as rentalsite.com or ur.com (United Rentals) that will offer a good deal.
Gantry cranes are a type of crane built atop a gantry, which is a structure used to straddle an object or workspace. They are also called portal cranes, the "portal" being the empty space straddled by the gantry. Dgcrane is professional material handling equipment manufacturer and servicer with largest production in global. Provide you with overhead crane, gantry crane, electric hoist, etc. of safe, reliable and efficient crane solutions and services.Welcome to inquiry dgcrane. The terms gantry crane and overhead crane are often used interchangeably, as both types of crane straddle their workload. The usual distinction drawn between the two is that with gantry cranes, the entire structure is usually wheeled. By contrast, the supporting structure of an overhead crane is fixed in location, often in the form of the walls or ceiling of a building, to which is attached a movable hoist running overhead along a rail or beam. Further confusing the issue is that gantry cranes may also incorporate a movable beam-mounted hoist in addition to the entire structure being wheeled, and some overhead cranes are suspended from a freestanding gantry.
A scrap crane is a crane (mobile or EOT -electric overhead traveling) in a scrap yard most commonly steel scrap. The applicaton I use is a EOT crane with a magnet. It loads steel scrap into a ladle which goes into a electric arc furnace.
There are layouts and diagrams of a bridge crane at Dearborn Overhead Crane. The diagrams are detailed and labeled. I didn't find a schematic but you can find images of the components of a bridgecrane at R&M Materials Handling.