Well, it depends on how long the months are, but if each month had 4 days, there would be 40 weeks in 10 months.
There are an even 4 weeks in 28 days.
The French get a mandatory seven weeks (35 days) of holidays!
This means 2 weeks or 10 business days.
2 weeks
There are 280 days in 40 weeks.
40 weeks is 280 days (40 x 7).
There are 5 weeks and 5 days in 40 days
there are 560 days in 80 weeks
40 weeks and 4 days
There are 7 days in a week therefore 7 times 40 = 280 days
No 28 days is 4 weeks 40 days is 5 weeks 5 days
There are 7 days in one week, so divide 285 by 7.The answer is 40 whole weeks and a remainder of 5 days.
There are seven days in a week. 40/7=5.714 or about six weeks.
40 / 7 = 5weeks 5days = (5 and 5/7) weeks = 5.7143 weeks (rounded)
That's about 40 days....
There are 7 days in a week. So 40 days is equivalent to 40 ÷ 7 = 5⁵/₇ weeks which is 5 weeks 5 days. The fraction to the side of 5 in the line above should read 5/7.