WBM (Water Bound Macadam) and WMM (Wet Mix Macadam) are used for Road construction in Base course layer. WMM is a new technology. difference between WBM and WMM can be summarized as below:Stone aggregate used in WBM is larger in size compared to WMM. In case of WBM its size varies between 45 mm to 90 mm depending upon the grade while in case of WMM aggregate size varies between 4.75 mm to 20 mmIn case of WBM stone aggregate, screening material and binders are overlaid one after another respectively at the time of construction. But in case of WMM, aggregate and binding materials are premixed in a batching plant or concrete mixing machine and then brought to site for overlaying and rolling.Materials used in WBM are stone aggregate, screening material (Kankar or murrum or smaller stone aggregate for filling up the voids ) and/or binding material (stone dust or Quary dust of PI not less than 6). materials used in WMM are Stone aggregate and binders (Stone dust or Quary dust of PI not less than 6)Quantity of WBM is generally measured in Cubic Meter while quantity of WMM is measured in Square Meter.
water bound macadam
Bells are cast at the foundry down the road.
Arch Bridge. Main use is road traffic.
It depends on the contaminant. Otherwise it's commonly used in fast foods.
1)wbm road 2)bt road
WBM stands for Water Bound Macadam, and the term WBM road was derived in the memory of an engineer by name Macadam who designed and formulated this road section. This road is laid by binding the in-situ layers of boulders, stones, fine aggregates and fillers. The filler is made from the mixture of sand combined with either moorum quary dust, or soil that is avilable in that locality.The filler is mixed with water and is used to fix stone boulders and the layers of coarse stones of varying sizes by compacting with a road roller to form the base of a road. The road can be used in this form itself.As an improvement, you can apply concreting or black topping above the WBM to make it better.Please see related link for the method of preparation a WBM road.
WBM stands for Water Bound Macadam, and the term WBM road was derived in the memory of an engineer by name Macadam who designed and formulated this road section. This road is laid by binding the in-situ layers of boulders, stones, fine aggregates and fillers. The filler is made from the mixture of sand combined with either moorum quary dust, or soil that is avilable in that locality.The filler is mixed with water and is used to fix stone boulders and the layers of coarse stones of varying sizes by compacting with a road roller to form the base of a road. The road can be used in this form itself.As an improvement, you can apply concreting or black topping above the WBM to make it better.Please see related link for the method of preparation a WBM road.
What about me
WBM (Water Bound Macadam) and WMM (Wet Mix Macadam) are used for Road construction in Base course layer. WMM is a new technology. difference between WBM and WMM can be summarized as below:Stone aggregate used in WBM is larger in size compared to WMM. In case of WBM its size varies between 45 mm to 90 mm depending upon the grade while in case of WMM aggregate size varies between 4.75 mm to 20 mmIn case of WBM stone aggregate, screening material and binders are overlaid one after another respectively at the time of construction. But in case of WMM, aggregate and binding materials are premixed in a batching plant or concrete mixing machine and then brought to site for overlaying and rolling.Materials used in WBM are stone aggregate, screening material (Kankar or murrum or smaller stone aggregate for filling up the voids ) and/or binding material (stone dust or Quary dust of PI not less than 6). materials used in WMM are Stone aggregate and binders (Stone dust or Quary dust of PI not less than 6)Quantity of WBM is generally measured in Cubic Meter while quantity of WMM is measured in Square Meter.
WBM (Water Bound Macadam) and WMM (Wet Mix Macadam) are used for Road construction in Base course layer. WMM is a new technology. difference between WBM and WMM can be summarized as below:Stone aggregate used in WBM is larger in size compared to WMM. In case of WBM its size varies between 45 mm to 90 mm depending upon the grade while in case of WMM aggregate size varies between 4.75 mm to 20 mmIn case of WBM stone aggregate, screening material and binders are overlaid one after another respectively at the time of construction. But in case of WMM, aggregate and binding materials are premixed in a batching plant or concrete mixing machine and then brought to site for overlaying and rolling.Materials used in WBM are stone aggregate, screening material (Kankar or murrum or smaller stone aggregate for filling up the voids ) and/or binding material (stone dust or Quary dust of PI not less than 6). materials used in WMM are Stone aggregate and binders (Stone dust or Quary dust of PI not less than 6)Quantity of WBM is generally measured in Cubic Meter while quantity of WMM is measured in Square Meter.WMM HAS MANY ADVANTAGES OVER WBM CONSTRUCTION1. SUPERIOR GRADATION OF AGGREGATES2.FASTER RATE OF CONSTRUCTION3.HIGHER STANDARD OF DENSIFICATION4.LESS CONSUMPTION OF WATER5. STRICTER STANDARD OF QUALITY ACHIEVABLE
water bound macadam
step 1-sight cleaning. step 2-excavation of sight. step 3-prepration of sub grade layer. step 4=prepration of base layer. step 5-prepration of base course.
For construction and repairing of National Highways up to the stage of laying of bitumen, water bound macadam (WBM) would be replaced by wet mix macadam (WMM) . Although WMM costs more, roads paved with WMM have greater quality. Moreover, black-topping can be done soon after laying WMM unlike WBM, said an official source. Waiting for WBM layer to dry up and solidify often takes days and causes much dusting of the road thereby hampering traffic. However, a road laid with WMM can be opened to traffic immediately after. According to procedures of laying WBM, stone types known as IRC (Indian Red Congress) grade I, II and III should be used. But in Manipur only IRC grade II and IRC grade III are used. These three grades of stones should be laid out layer above layer before covering it with earth. Then the layer is soaked with water before running it over by roller to solidify the road surface. It takes around a month for such a road surface to dry up before black-topping can be done. In WMM method, stones, binding material and water are mixed proportionately and the mixture is laid out at one time. Such road once run over by roller can be opened to traffic. Bitumen can also laid immediately after, said the source. Some states have already adopted WMM method since a few years back. As roads laid with WMM have greater quality, the same method will be applied while repairing Moreh-Pallel sector and North AOC-Maram sector of NH 39 on trial basis. The Ministry of Shipping, Surface Transport and Highways has also instructed the State Government to use WMM in place of WBM. Subsequently, work orders issued for repairing different segments of NH 39 specified use of WMM.