typically, a keyway is found in a wall made of concrete where there is two separate pours which abut themselves, otherwise referred to as a cold joint. it makes sense to insert a concave keyway continously along the length and in the center of a section of the first wall section poured to receive an abutting concrete pour at a later date. this inserted keyway creates an interlocking style effect between the two abutting pours which creates a higher quality connection than simply butting the two pours with nothing to interconnect them.

typically, a keyway is found in a wall made of concrete where there is two separate pours which abut themselves, otherwise referred to as a cold joint. it makes sense to insert a concave keyway continously along the length and in the center of a section of the first wall section poured to receive an abutting concrete pour at a later date. this inserted keyway creates an interlocking style effect between the two abutting pours which creates a higher quality connection than simply butting the two pours with nothing to interconnect them.

User Avatar

Wiki User

13y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: Why do you need a keyway in the construction of a wall?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is a Cold joint keyway?

A cold joint keyway is a type of construction joint used in concrete work. It is created by stopping the pouring of concrete at a specific location and then continuing later. Keyways are created by using a special tool or construction joint form to shape the concrete for proper bonding when the second pour occurs.


What is the purpose of construction of Great Wall of China?

purpose of construction of great wall of china to protect from attacker at china


When was Keyway Air Transport created?

Keyway Air Transport was created in 1986.


What is the purpose of a keyway in a slab on grade?

The purpose of a keyway is to stop the movement of the foundation.


When did the construction of the great wall of China?

Construction of the Great Wall of China was started in approximately 221 B.C. Construction continued on and off until 1500 A.D.


When did the berlin wall construction began?

The construction of the Berlin wall begun on August 13, 1961.


When the construction of the great wall of China begin?

Construction of the Great Wall of China was started in approximately 221 B.C. Construction continued on and off until 1500 A.D.


When did construction of the Wall Begin?

Berlin Wall was started in August 1961


How to form a construction joint in a wall?

Dummp joint in retaining wall


What is the distance between studs in a typical wall construction?

The distance between studs in a typical wall construction is usually 16 inches on center.


How many layers of drywall are typically used in a standard wall construction?

In standard wall construction, two layers of drywall are typically used.


What is the recommended spacing for metal studs in a wall construction?

The recommended spacing for metal studs in wall construction is typically 16 inches on center.