Load dispatch centre is simply coordination agency of state electricity board. LDC is for ensuring the mechanism of safe and grid electrical operations for the transmission which decide how much amount of energy to provide or to cut for the consumers.It's a link bet'n generation,transmisson and distribution of electricity in the power system.Sorry if therez any gram. mistake as i'm student,there may be..!Gohil Dilavar Sinh
Yes. In order to do work, there has to be a load. In order for there to be current, there has to be a load. Now, that is probably not what you meant to ask. If so, please restate the question correctly.
The center of balance
Sensible Heat Ratio - SHR - is defined as the sensible heat or cooling load divided by the total heat or cooling load.
If you know how many amps your load draws then divide this into 26 and your answer will be the number of hours (approximately) you can sustain the load.
The length of the cable is determined by the distance from the center of the distribution panel to the center of the load.
load time is the time it takes to load a shipment. dispatch time is how long it should take the shipment to arrive at destination
A load center, or distribution board, is a panel that distributes electrical power in a building. It typically contains circuit breakers or fuses to protect circuits from overloading. The load center is where the main power feed enters a building and branches out to various circuits.
The load is composed of silk sheets
The load is composed of silk sheets
Emergency Communications Center
Emergency Communications Center
Front Load refers to "forward" logistics, trucking, dispatch, or delivery of items from point of dispatch to the point of delivery.Example: Truck delivers Product from Warehouse to Client.Back Load on the other hand refers to "reverse" logistics, that is to say, the return of items from the point of delivery to the point of dispatch.Example: Truck returns Product from Client to Warehouse, as in the case of defective or damaged goods.
Economic Dispatch l Given load l Given set of units on-line l How much should each unit generate to meet this load at minimum cost? G G G Load Unit Commitment l Given load profile (e.g. values of the load for each hour of a day) l Given set of units available l When should each unit be started, stopped and how much should it generate to meet the load at minimum cost? rajirahulm@gmail.com
Emergency Communications Center
The same name breakers as the manufacture of the load center.
The load is composed of silk sheets
The load is composed of silk sheets