Step 1: Formulate / Modify business visions, policies, objectives
Step 2: Formulate / Modify business strategies according to changing customer requirements, technology changes and competition
Step 3: Analyze the existing business process cycles & workflows and determine how they may be modified or refined
Step 4: Apply IT to setup an optimal Business Information Management Architecture (BIMA) to support the reengineered business process
Step 5: Modify or redesign the existing processes according to the reengineering strategies and develop refined Business Process Automation Systems (BPAS)
Step 6: Apply IT strategies to map BIMA onto an Enterprise Information Management System (EIMS) that is integrated across the enterprise and that fits into and supports the reengineered Business process cycles and workflows.
Step 7: Integrate the EIMS with the BPAS to build up the completed reengineered business system
Step 8: Repeat steps 1-7 for continuous BPR due to changing customer demands, technology changes and business strategies, which leads to business stability
Since information management is a key factor in BPR, the BPR efforts are enabled & supported by a variety of IT solutions.
Copyright (c).
build a prototype....- glads to help(;
A rate-governed or rate-limiting process is a process in which there are several steps; however, the rate of one or more steps is much slower than all the others. The rates of the previous steps and following steps are assuming to be infinite, and the rate of the process only depends on the rate-limiting step(s).
Surveying Architectural works or design Structural works Approval Tendering Construction
Process re-engineering life, it contains the complete life cycle of how the process is changing. What are the steps to change the process. It is closely related to Business process re-engineering. The steps of PRLC are: 1) Envision: In it, it is checked the secured commitment with the top management. Then we have to proceed. 2) Initiate Change: After checking the commitment form the top management, we have to initiate the new change what we are going to made in the process. 3) Process Analysis: Then we have to analyze the whole process and have to identify what are the necessary changes to the process. 4) Process Re-design: Then we have to re design the process by implementing all the necessary changes to a process. 5) Constructing: In it, we are implementing all the changes that are required to re-desing a process. 6) Implementing and maintaining: In it, we are implementing all the changes to a process and then last step is to maintenance of the process.
inception, elaboration
To have little room for errors.
build a prototype....- glads to help(;
Identify a needKnow the backgroundMake a planDo the workTest the resultedEvaluate and redesign-Apex
A rate-governed or rate-limiting process is a process in which there are several steps; however, the rate of one or more steps is much slower than all the others. The rates of the previous steps and following steps are assuming to be infinite, and the rate of the process only depends on the rate-limiting step(s).
Surveying Architectural works or design Structural works Approval Tendering Construction
There are many varieties of engineering classes which means there are different steps but here are some engineering jobs. Take this in mind that this is only Average Mechanical- 15 steps Electrical- 7 steps Robotics- 5 steps
Can you give and example of an engineering process?
It is a procees design Engineering
Process re-engineering life, it contains the complete life cycle of how the process is changing. What are the steps to change the process. It is closely related to Business process re-engineering. The steps of PRLC are: 1) Envision: In it, it is checked the secured commitment with the top management. Then we have to proceed. 2) Initiate Change: After checking the commitment form the top management, we have to initiate the new change what we are going to made in the process. 3) Process Analysis: Then we have to analyze the whole process and have to identify what are the necessary changes to the process. 4) Process Re-design: Then we have to re design the process by implementing all the necessary changes to a process. 5) Constructing: In it, we are implementing all the changes that are required to re-desing a process. 6) Implementing and maintaining: In it, we are implementing all the changes to a process and then last step is to maintenance of the process.
the steps are design prototype test evaluate
Parker Engineering's motto is 'Process Engineering Solutions'.
inception, elaboration