answersLogoWhite

0


Verified answer

Identifying a need, researching the background of that need, making a plan to meet the need, doing the work, evaluating the results, looking for improvements

User Avatar

Wiki User

6y ago
This answer is:
User Avatar
More answers
User Avatar

Izabella Bins

Lvl 10
3y ago

Step 1: Formulate / Modify business visions, policies, objectives

Step 2: Formulate / Modify business strategies according to changing customer requirements, technology changes and competition

Step 3: Analyze the existing business process cycles & workflows and determine how they may be modified or refined

Step 4: Apply IT to setup an optimal Business Information Management Architecture (BIMA) to support the reengineered business process

Step 5: Modify or redesign the existing processes according to the reengineering strategies and develop refined Business Process Automation Systems (BPAS)

Step 6: Apply IT strategies to map BIMA onto an Enterprise Information Management System (EIMS) that is integrated across the enterprise and that fits into and supports the reengineered Business process cycles and workflows.

Step 7: Integrate the EIMS with the BPAS to build up the completed reengineered business system

Step 8: Repeat steps 1-7 for continuous BPR due to changing customer demands, technology changes and business strategies, which leads to business stability

Since information management is a key factor in BPR, the BPR efforts are enabled & supported by a variety of IT solutions.

Copyright (c).

This answer is:
User Avatar

User Avatar

Wiki User

12y ago

Identifying a need, researching the background of that need, making a plan to meet the need, doing the work, evaluating the results, looking for improvements

This answer is:
User Avatar

User Avatar

Wiki User

13y ago

1. Investigate

2. Design

3. Make

4. Evaluate

This answer is:
User Avatar
Still have questions?
magnify glass
imp
Continue Learning about Engineering

Which of these steps of the engineering design process should come last?

build a prototype....- glads to help(;


What is a rate governed process in Chemical Engineering?

A rate-governed or rate-limiting process is a process in which there are several steps; however, the rate of one or more steps is much slower than all the others. The rates of the previous steps and following steps are assuming to be infinite, and the rate of the process only depends on the rate-limiting step(s).


What are the 6 steps to the engineering process?

Surveying Architectural works or design Structural works Approval Tendering Construction


What is process re-engineering life cycle?

Process re-engineering life, it contains the complete life cycle of how the process is changing. What are the steps to change the process. It is closely related to Business process re-engineering. The steps of PRLC are: 1) Envision: In it, it is checked the secured commitment with the top management. Then we have to proceed. 2) Initiate Change: After checking the commitment form the top management, we have to initiate the new change what we are going to made in the process. 3) Process Analysis: Then we have to analyze the whole process and have to identify what are the necessary changes to the process. 4) Process Re-design: Then we have to re design the process by implementing all the necessary changes to a process. 5) Constructing: In it, we are implementing all the changes that are required to re-desing a process. 6) Implementing and maintaining: In it, we are implementing all the changes to a process and then last step is to maintenance of the process.


What are the 6 steps in requirements engineering?

inception, elaboration

Related questions

In the engineering design process why would you need to repeat some steps in the process?

To have little room for errors.


Which of these steps of the engineering design process should come last?

build a prototype....- glads to help(;


What are the Steps to Engineering process?

Identify a needKnow the backgroundMake a planDo the workTest the resultedEvaluate and redesign-Apex


What is a rate governed process in Chemical Engineering?

A rate-governed or rate-limiting process is a process in which there are several steps; however, the rate of one or more steps is much slower than all the others. The rates of the previous steps and following steps are assuming to be infinite, and the rate of the process only depends on the rate-limiting step(s).


What are the 6 steps to the engineering process?

Surveying Architectural works or design Structural works Approval Tendering Construction


How many stages of engineering classes to be an engineer?

There are many varieties of engineering classes which means there are different steps but here are some engineering jobs. Take this in mind that this is only Average Mechanical- 15 steps Electrical- 7 steps Robotics- 5 steps


Can you give and example of an engineering process?

Can you give and example of an engineering process?


What is process engineering?

It is a procees design Engineering


What is process re-engineering life cycle?

Process re-engineering life, it contains the complete life cycle of how the process is changing. What are the steps to change the process. It is closely related to Business process re-engineering. The steps of PRLC are: 1) Envision: In it, it is checked the secured commitment with the top management. Then we have to proceed. 2) Initiate Change: After checking the commitment form the top management, we have to initiate the new change what we are going to made in the process. 3) Process Analysis: Then we have to analyze the whole process and have to identify what are the necessary changes to the process. 4) Process Re-design: Then we have to re design the process by implementing all the necessary changes to a process. 5) Constructing: In it, we are implementing all the changes that are required to re-desing a process. 6) Implementing and maintaining: In it, we are implementing all the changes to a process and then last step is to maintenance of the process.


What are the 4 steps of the engineering cycle?

the steps are design prototype test evaluate


What is Parker Engineering's motto?

Parker Engineering's motto is 'Process Engineering Solutions'.


What are the 6 steps in requirements engineering?

inception, elaboration