It takes approximately 8 months to build a 737. Boeing is increasing production at present, with the -800 model.
turbofan
The Boeing 737 NG has 2 engines (CFM International CFM56)
It takes with all the matterials about four years, so from scratch it would take around seven years.
2. One under each wing.
The Boeing 737-900ER cost $89.6 million.
it would cost about $.38000
1 dollar.
It takes approximately 8 months to build a 737. Boeing is increasing production at present, with the -800 model.
1 dollar.
89.1 million
The Boeing 737 is one of the most popular jet airliners in the world. The cost depends on the model and ranges from $51 million to about $80 million.
I am trying to find out how much a boeing 737-300 costs and this bad website wants me to answere that question. For a proper answere visit a good websit called http://localhost/index.html.
3 days
Assuming you mean Alaskan Airlines, their fleet consists of: Boeing 737-900 Boeing 737-900ER Boeing 737-800 Boeing 737-700 Boeing 737-400 Boeing 737-400 Combi Bombardier Q400 Bombardier CRJ-700
The Boeing 737 is assembled in Renton, WA
lots