The answer is, remarkably, 6. Answer: "6 sack" or "6 bag mix" has six bags of cement per cubic yard of concrete mix. Since each sack/bag contains 94 lbs of dry cement, this equals 564 lbs of cement per cubic yard of concrete.
19,000lbs of rock. 1340 sand. 338 cement.
5 sacks of cement per 1 yard of concrete
Concrete strength is measured by "bag mix", meaning that the bag mix answers the question, how many bags of cement per yard of concrete. If you're looking for a "6 bag" mix, that means 6 bags of cement per yard of concrete. A "bag" of cement is 1 cubic foot. A yard of concrete is 27 cubic feet (3 X 3 X 3 = 27). If you want to make a "6 bag mix" of concrete, using 1 bag of cement, you would make 1/6 yard concrete with 1 bag of cement. If you would be content with a "5 bag mix", you could make 1/5 yard. Concrete is often defined as ratios of cement,sand,aggregate such as: 1:2:3 which is a very common mix. For a 1:2:3 mix you would need 1/6th of the volume to be cement. The dry ingredients are generally 1.6 x finished concrete volume. Therefore dry volumen for 1 cubic yard = 1.6 cu yards = 43.2 cu ft. 1/6 x 43.2 = 7.2cu ft. Therefore, if one bag is 1 cu ft we need 7.2 bags for a healthy 1:2:3 mix. A '6 bag mix' or a '5 bag mix' are a bit short on cement.
10
The answer is, remarkably, 6. Answer: "6 sack" or "6 bag mix" has six bags of cement per cubic yard of concrete mix. Since each sack/bag contains 94 lbs of dry cement, this equals 564 lbs of cement per cubic yard of concrete.
19,000lbs of rock. 1340 sand. 338 cement.
500 pounds cement, 1500 pounds sand, 1600 pounds gravel. Mix with 32 gallons water
Forty five 80 pound bags of cement are needed to make one cubic yard of concrete.
What is the weight of one cubic yard of cement? If you are asking the weight of 1 cubic yard of CONCRETE it is approximately 2 tons or 4000 pounds per cubic yard when wet.
5 sacks of cement per 1 yard of concrete
The cement density is used in the calculation of the total aggregate content and of the concrete density.Normal concrete has a density around 2400 kg/cubic meter or 4048 lb/cubic yard. There are many different kinds of concrete, many of which are much lighter. Cement is the liquid (or paste like) form, and tends to be much heavier than when it has cured into concrete. "Cement" is not concrete, but can be used to make concrete by mixing with sand, stone and water. The density of cement is about 3120kg/m3.
The cement density is used in the calculation of the total aggregate content and of the concrete density.Normal concrete has a density around 2400 kg/cubic meter or 4048 lb/cubic yard. There are many different kinds of concrete, many of which are much lighter. Cement is the liquid (or paste like) form, and tends to be much heavier than when it has cured into concrete. "Cement" is not concrete, but can be used to make concrete by mixing with sand, stone and water. The density of cement is about 3120kg/m3.
This can vary do to the mixture of sand, stone, cement... but an approximate average would be 3000 lbs
According to the website Concrete Network, in 2008 the average price of concrete in the United States was $75 per cubic yard. That price includes the mixing of the concrete by a professional installer. The website Servicemagic lists the price at $70 per cubic yard.
Concrete strength is measured by "bag mix", meaning that the bag mix answers the question, how many bags of cement per yard of concrete. If you're looking for a "6 bag" mix, that means 6 bags of cement per yard of concrete. A "bag" of cement is 1 cubic foot. A yard of concrete is 27 cubic feet (3 X 3 X 3 = 27). If you want to make a "6 bag mix" of concrete, using 1 bag of cement, you would make 1/6 yard concrete with 1 bag of cement. If you would be content with a "5 bag mix", you could make 1/5 yard. Concrete is often defined as ratios of cement,sand,aggregate such as: 1:2:3 which is a very common mix. For a 1:2:3 mix you would need 1/6th of the volume to be cement. The dry ingredients are generally 1.6 x finished concrete volume. Therefore dry volumen for 1 cubic yard = 1.6 cu yards = 43.2 cu ft. 1/6 x 43.2 = 7.2cu ft. Therefore, if one bag is 1 cu ft we need 7.2 bags for a healthy 1:2:3 mix. A '6 bag mix' or a '5 bag mix' are a bit short on cement.
This can vary do to the mixture of sand, stone, cement... but an approximate average would be 3000 lbs