Chat with our AI personalities
You need to calculate the total volume of the space that the concrete has to fill. if you're doing a slab 4" thick a cu. yd. will cover 81 sq. ft. Take the total area and divide by 81 to get the number of yard needed.
10.94 bags
Mainly it is because of water cement ratio(w/c ratio) Handling of cube Treatment of cube Curing
1:2:4
To make 1 cubic meter of concrete, you typically need about 1.5 cubic meters of sand and gravel combined. The general ratio for mixing concrete is 1 part cement, 2 parts sand, and 3 parts gravel. Therefore, for 1 cubic meter of concrete, you would need 0.5 cubic meters of cement, 0.75 cubic meters of sand, and 0.75 cubic meters of gravel.