The Fluke T5 is voltage continuity and current tester, meaning that its purpose is to test the voltages, ohms and amps of electrical devices used primarily by electricians.
An open-circuit test is done with the transformer running at its rated voltage but with no load. This measures the power lost in the magnetic core. (IR Losses) A short-circuit test is done with the transformer running at its full rated current in all windings but at a low voltage. The secondary is shorted and the primary voltage is adjusted to give the rated current. This measures the power lost in the copper windings. (Copper losses)
magnetising current test, magnetising balance test, s.c test, vector group test, winding resistance test, ratio test
On installed transformer a test is performed to check weather it has any oil leakage or not, the test is called pressure test, more precisely pressure leakage test.
Short circuit test and open circuit test are widely used to test the efficiency of the transformer.
in this test their is a no load on dc shunt motor so it is an indirect test
The purpose of the test in education serves a double purpose. The test is an assessment of what the student has learned. It is also a measure of the quality of the teaching.
To determine when a test has completed.
to test for aids
To test the validity of an account balance.
To determine when a test has completed.
The purpose of the Life in the United Kingdom test is to prepare people for a citizenship or settlement there. Also to test their usage of the english language.
The Ames test identifies chemical mutagens.
I think it's a test for a shorted armature.
In a charpy impact test, the purpose of the notch is to provide a point of fracture at the same point for each material, to make it a fair test.
To test a hypothesis
hypothesis or theory