Including the start and end dates in the calculation, there are 177 days between the two dates.
363 days.
Including the start and end dates in the calculation, there are 554 days between the two dates.
Including the start and end dates in the calculation, there are 4456 days between the two dates.
85 days.
From and including: Tuesday, 25 August 2009 to and including: Saturday, 13 March 2010 it is 201 days.
Assuming a start date of March 20, 2010, there are 54 days between January 25 and the start of spring.
One day lasts for 60 x 24 = 1440 minutes. There are 34 days between March 23 and April 25. Therefore, 34 days is equal to 34 x 1440 = 48960 minutes.
Normally there are 25 weeks and 6 days between a 1st of September and a 1st of March. If the March is in a leap year, then there is exactly 26 weeks between the two dates.
131 days.
567 days.
As today is 25 March 2015, 15 March 2015 was ten days (one week three days) ago.