A desired specification for a product or system would be something that has been asked of specifically by the client.
For example: 'I want a chair that has 6 legs, 90cm high and 50cm wide, the colour has to be purple and made from wood'.
Something that is desired is wanted. If you didn't meet the specifications mentioned above, it wouldn't have met the desired specifications.
Chat with our AI personalities
Specification of Material is required in engineering technology to maintain the quality & to find the ability to manufacture specific item/ product. such as Engine, computer, Buildings etc. A good product cannot be made without specification of material.
It should only specify what the system should do and refrain from stating how to do these. This means that the SRS document should specify the external behavior of the system and not discuss the implementation issues. The SRS document should view the system to be developed as black box, and should specify the externally visible behavior of the system. For this reason, the SRS document is also called the black-box specification of a system.
Something that should be provided by the project, but currently is not (or is forecast not to be) provided. This might be a missing product or a product not meeting its specifications. It is one type of issue.
An SRS document is formed after requirement engineering. The SRS stands for Software Requirement Specification.
yehhh i reallyy dont want to be with you.