The number of yards a front end loader bucket will hold depends on the material. A front end loader will fit about 1.5 to 2 yards of topsoil.
The amount of gallons of water a washing machine can hold depends on whether it is a top loader or a front loader. Top loaders can hold about 25 gallons of water. A front loader can only hold about 5 gallons of water.
The capacity of a skid loader bucket can vary depending on its size and manufacturer. A typical skid loader bucket can hold anywhere from 11 to 22 cubic feet of sand, which translates to roughly 800 to 1600 pounds of sand.
A bucket seat is a seat designed to hold exactly one person, as opposed to a bench seat which can hold two or more. In general, the driver and front passenger of a car are bucket seats, while the back row is a bench seat.
It depends on the bucket being used. Check the bucket because it might say how many litres the bucket can hold
It depends on the bucket size, but usually a standard size bucket would hold a few litters of water.
a bucket...
It depends on the volume of the bucket.
on what machine? I have a dirt bike and all you do is hold the front brake and lean forward and gas it....
I have a 97 venture, but the 2002 is likely the same. First, make sure the bucket is adjusted to the rearmost position. Next, reach down behind the bucket, near the floor, and there will be a fabric strap w/loop........Pull up on the strap and it will release the latch in the rear of the bucket, releasing both ends from the hold-down bars (one on each side - they are recessed below the floor, in a small cup) . Then, tilt / rotate the bucket forward and upward and let it pivot on the 2 front hold-down bars.........Carefully lift the bucket completely up and out of the front bars. Reverse the procedure to re-install.....The rear latch will automatically lock as you push the bucket down and into the rear bars. Make sure the front hooks on the bucket are latched in the front OK.....good luck!
Can be a 'plow' or a 'blade' but if you are thinking of the thing for loading and such, they are called 'buckets' and are sized according to how many cubic yards of material they can hold. As in 4yrd bucket or 20yrd bucket (a really huge dozer).
Depends on the size and shape of the bucket.