12
Where I live, concrete is now $100 per cubic yard, or $500 total. That is for a local delivery.
Concrete in the bulk is measured in cubic yards. Concrete on the ground is often measured by square yards, but the depth of the concrete must be known, too. The price per cubic yard varies a lot across the US, plus not knowing the thickness of the concrete means that your question cannot reasonably be answered.
The answer depends on whether you mean 114 feet squared or a square 114 feet by 114 feet. The answer to the first scenario is 76 square yards of concrete. The answer to the second scenario is 8,664 square yards of concrete.
You will need 0.56 cubic yards of concrete.
how much does 3 yards of concrete cost
the minimum is 2 yards.
12
How much is 4.5 yards of concrete in Red Oak TX
This cylinder will require 1.4 cubic yards of concrete (this assumes a length of 12' and a width of 2').
25856 / 27 = 958 yards of concrete @ $75 per yard = $71,850
The term "yards" of concrete means cubic yards.
Where I live, concrete is now $100 per cubic yard, or $500 total. That is for a local delivery.
It is typically measures in cubic yards. Anything over 2 cubic yards is a lot of mixing, so you'd likely want to order that from a concrete company in a ready mix concrete truck.
You should be able to find it for about 100-150 a yard.
Concrete in the bulk is measured in cubic yards. Concrete on the ground is often measured by square yards, but the depth of the concrete must be known, too. The price per cubic yard varies a lot across the US, plus not knowing the thickness of the concrete means that your question cannot reasonably be answered.
Assuming you mean 28ft x 28ft x 6ft you would need 174 2/9 yards of concrete, assuming no waste.