0.86 cubic yards is needed.
You will need a minimum of 18.96 cubic yards.
A minimum of 5.93 cubic yards is needed.
At 4" thick you would need at least 7.04 cubic yards. At 6" thick you'll need at least 10.56 cubic yards. If the slab is 2" thick, you'll need 3.52cubic yards.
For this area you will need 2.4 cubic yards.
You'll need 1 cubic yard.
1.85 cubic yards of cement.
5.93 cubic yards.
You will need a minimum of 18.96 cubic yards.
A minimum of 5.93 cubic yards is needed.
A 16' x 8' by 4" slab requires 3.56 cubic yards of cement.
At 8" thick, you will need at least 4.67 cubic yards.
At 4" thick you would need at least 7.04 cubic yards. At 6" thick you'll need at least 10.56 cubic yards. If the slab is 2" thick, you'll need 3.52cubic yards.
You'll need a minimum of 1.85 cubic yards for that size.
For this area you will need 2.4 cubic yards.
about 25 yds
9.3 cubic yards of cement is required for this slab.
You'll need 1 cubic yard.