There in no difference between an accounts officer and an accountant other than the job level. They both provide account management services.
there no difference between break even profit analysis and cost volume profit analysis
pledging is a
Credit sales referes to sales and accounts payable referes to bank
Temporary accounts are like your revenue, expense, owner's drawing accounts and the income summary. Permanent accounts are like your assets, liability, and most of owner's equity accounts.
ffsdsd
there is a difference
what is the difference between product analysis and heat analysis
manufacturing process of steel plates difference between heat and product analysis ?
manufacturing process of steel plates difference between heat and product analysis ?
Starting a new business requires many decisions. List five examples of decisions that might be assisted by engineering economics analysis
Mechanical engineering deals with principles of engineering, physics and materials science for analysis, design, manufacturing, and maintenance of mechanical systems. Industrial engineering deals with the optimization of complex processes or systems. It is concerned with the development, improvement, implementation and evaluation of integrated systems of people, money, knowledge, information, equipment, energy, materials, analysis and synthesis.
There is no difference between value analysis and value engineering. Both are names applied to the same formal analytical process developed at General Electric in 1947 by Larry Miles. It was originally called value analysis, and has come to be called by several names as time has passed (value analysis, value engineering, value management, the value methodology). The term "Value Engineering" is also often mis-used to refer to any exercise to reduce cost. Don Stafford, VP-Education, SAVE International
Difference between e-resuming system of bdjobs and phrotom alo.com
Value analysis is "A Systematic and objective evaluation of the value of a goods or service, focusing on analysis of function relative to the cost of manufacturing or providing the items or service". value analysis provides insight into the inherent worth of final goods or service, possibly altering specifications and quality requirements that could reduce costs without impairing functional suitability. Value engineering is "Value analysis conducted at the design engineering stage of the product development process." In summary value analysis refers to the analysis of an existing product, service or administrative process while Value engineering refers to the same analysis applied to the product ,services or administrative processes that are under design and have not been finalised.
Yes, there is a difference.
spelling difference