System specification refers to each and every detail about the project. SRS document is used as a contract between the users and the developers.
use template.
The architecture have to be designed before specifications are written, because • to provide a means of structuring • the specification and developing different sub-system specifications concurrently • to allow manufacture of hardware by sub-contractors • and to provide a model for system costing. Writing specification for the whole system might bring great complexity and it is difficult to formulate it. Therefore, it is easier to divide the system into simpler subsystems and define their specification and it will save you the hassle of defining specification and put it into the respective subsystem. Hence we can concurrently develop subsystems and the specifications to be readily into the implementation stage. Kajutzs.
Design specification
It should only specify what the system should do and refrain from stating how to do these. This means that the SRS document should specify the external behavior of the system and not discuss the implementation issues. The SRS document should view the system to be developed as black box, and should specify the externally visible behavior of the system. For this reason, the SRS document is also called the black-box specification of a system.
Enough to fill it to the manufacturer's specification.
"Portable Operating System Inferance (for Unix)
The computer just needs to have the port the keyboard has, but it's impossible these days not to have it.
yehhh i reallyy dont want to be with you.
Confirming that a system element meets its design-to specification
It depends on the specification.
When required by a specification. Usually found in old governemt specifications.
Yes, the PC will run alright depending with the system properties and its specification.