0
Anonymous
Floyd Smith ∙
Chat with our AI personalities
As long asthe builders needed!
A man made of recycling
2006
The WEEE man is made of old electrical items most of witch can be found in any kitchen. :D :)
Waste Electrical and Electronic Equipment.
couple years
i think he was built some time in 2006
to show how much waste people throw away in their lifetime
75 / 5 = 15 days for 12 men to build one house. 15x12 = 180 days for 1 man to build 1 house. 180 x 7 = 1260 days for 1 man to build 7 houses. 1260 / 20 = 61 days for 20 men to build 7 houses.
The 2,063 feet high tower was assembled in 33 working days in 1963. There were no casualties among the 11-man crew.
Building 5 houses takes 12 x 75 ie 900 man-days. 20 men will thus take 900/20 ie 45 days.